Files
oci-deal-accelerator/docs/business-case-flow.md
root 4552ef7226
Some checks failed
Deploy Skill to OCI / deploy (push) Failing after 19s
Diagram validators / diagram-validators (push) Failing after 22s
SKILL.md sync / check-sync (push) Successful in 17s
SKU Catalog Refresh / refresh-and-discover (push) Failing after 30s
KB Health Check / check-links (push) Successful in 57s
Enhance ADB-S to ADB-D business cases
2026-05-08 15:25:21 -03:00

2.4 KiB

Business Case Flow

Option 8 produces an executive business-case deck plus reusable YAML backing data. For ADB-S to ADB-D cases, use business_case.adbs_to_adbd.

ADB-S to ADB-D Rules

  • Keep workload/billable ECPU demand comparable between ADB-S and ADB-D unless the customer provides a different target demand.
  • Dedicated physical capacity is a separate fixed footprint: DB nodes x ECPU per DB node.
  • Never model ADB-D at 100% utilization by default. Show utilization explicitly.
  • ADB-D fixed infrastructure includes DB servers and storage servers; workload ECPU demand remains a separate line.
  • Projected BOMs are annual run-rate snapshots at the horizon, not cumulative multi-year totals.
  • GoldenGate can be steady_state, migration_bridge_only, or migration_plus_fallback_months. Bridge-only GoldenGate is excluded from future steady-state BOMs.

Read Architecture

ADB-S and ADB-D can carry the same workload demand while using different read architectures. ADB-S may require refreshable/read clones when standby is not the application read path. ADB-D may use Local ADG read-only standby and retire steady-state clones. The deck should call this out in BOM notes, value drivers, and risk/value slides.

Storage Economics

Storage economics are shown separately from aggregate TCO:

break-even TB = fixed dedicated infra monthly cost / ADB-S storage USD per GB-month / 1024

Apply discounts uniformly when comparing scenarios. If customer material provides a baseline break-even, show it beside the recalculated break-even for the proposed footprint.

Business Value

Risk-reduction cases use a Business Value Model instead of generic ROI percentages. Do not invent revenue impact. Convert stability to USD only when the customer provides revenue-at-risk, transaction margin, fraud loss impact, or cost per degraded/outage hour.

Use:

avoided degraded/outage hours x business impact per hour

Track success metrics such as CPU utilization, read latency, clone lag retired, ADG read lag, GoldenGate/apply lag during migration, incidents avoided, and degraded hours avoided.

Validation

Business-case deck validation reads text boxes, table cells, and grouped shapes. It checks expected titles, disclaimer-last, required assumptions, and forbidden obsolete phrases such as OCI Annual, stale scenario risks, and unclear language like FTE-year.