# Engagement Tiers Engagement tiers scale artifact depth to match engagement complexity. Not every deal needs a 15-slide deck and full ADR set. ## Tier Definitions ### Small (Rapid Innovation) **Profile:** Single workload, single region, minimal compliance, short timeline. **Examples:** - Autonomous Database + Analytics Cloud dashboard - Single app migration to OKE - PoC or pilot deployment **Characteristics:** - 1-2 applications in scope - No compliance frameworks - Single OCI region - 0-2 integration points - Budget < $10K/month - Timeline < 4 weeks design **Artifact depth:** Highly templated, minimal customization. The Value Story can be a single paragraph. The deck is 6-8 slides. No separate operations model — include a "Day-2" slide. ### Standard (Extend Capabilities) **Profile:** Multi-component architecture, moderate complexity, typical enterprise engagement. **Examples:** - Oracle DB migration with HA/DR to ADB-S - Multi-tier application modernization - Hybrid cloud with FastConnect **Characteristics:** - 3-10 applications in scope - 1 compliance framework (PCI, SOC2, HIPAA) - 1-2 OCI regions - 3-5 integration points - Budget $10K-100K/month - Timeline 4-12 weeks design **Artifact depth:** Full template set. 10-12 slide deck. Separate cost spreadsheet. Operations model as 1-page summary. 4-6 ADRs. ### Complex (Business Transformation) **Profile:** Enterprise-wide transformation, multi-region, multiple compliance, long timeline. **Examples:** - Full data center migration (50+ workloads) - Multi-cloud architecture with OCI as primary - Regulated industry platform (banking, healthcare) **Characteristics:** - 10+ applications in scope - Multiple compliance frameworks - 3+ OCI regions - 5+ integration points - Budget > $100K/month - Timeline 12+ weeks design **Artifact depth:** Full customized artifacts. 12-15 slide deck (possibly multi-deck). Full operations model. Detailed migration plan as separate document. Full risk register. Comprehensive WA report. ## Artifact Matrix | Artifact | Small | Standard | Complex | |----------|-------|----------|---------| | **DEFINE** | | | | | Value Story | 1 paragraph | Full template | Full + executive summary | | Workload Profile | Minimal fields | Standard fields | All fields + appendix | | Joint Engagement Plan | Email/verbal | 1-page template | Full template | | **DESIGN** | | | | | Slide deck | 6-8 slides | 10-12 slides | 12-15 slides | | Architecture diagram | Single-page simple | Single-page detailed | Multi-page | | Cost estimate | In-deck table | Separate .xlsx | Detailed .xlsx with scenarios | | ADRs | 2-3 inline in deck | 4-6 separate | Full ADR documents | | Migration plan | 1 slide | 2-3 slides | Separate document | | Operations model | 1 "Day-2" slide | 1-page summary | Full template | | Transition design | Inline in migration | Separate section | Separate document | | Risk register | Top 3-5 in deck | Top 5-8 in deck | Full register document | | WA scorecard | Traffic lights only | With recommendations | Full WA report | | **DELIVER** | | | | | Handover document | 1-page summary | Full template | Full + appendices | | MVP definition | Inline in handover | Separate section | Phased roadmap | | Go-live checklist | 10-15 items | 20-30 items | 30-50 items | | Success criteria | 3-5 metrics | 5-8 metrics | 8-12 metrics | | Lessons learned | Brief notes | Full template | Full + retrospective | ## Tier Selection Logic Select tier based on the **highest complexity signal**. If 8 out of 10 signals say "small" but compliance says "complex", use **standard** (not complex — let the single complex dimension drive up one tier, not two). ``` IF any signal is "complex" AND 2+ signals are "complex": → Complex tier ELIF any signal is "complex" OR 3+ signals are "standard": → Standard tier ELSE: → Small tier ```