2.4 KiB
Business Case Flow
Option 8 produces an executive business-case deck plus reusable YAML backing
data. For ADB-S to ADB-D cases, use business_case.adbs_to_adbd.
ADB-S to ADB-D Rules
- Keep workload/billable ECPU demand comparable between ADB-S and ADB-D unless the customer provides a different target demand.
- Dedicated physical capacity is a separate fixed footprint:
DB nodes x ECPU per DB node. - Never model ADB-D at 100% utilization by default. Show utilization explicitly.
- ADB-D fixed infrastructure includes DB servers and storage servers; workload ECPU demand remains a separate line.
- Projected BOMs are annual run-rate snapshots at the horizon, not cumulative multi-year totals.
- GoldenGate can be
steady_state,migration_bridge_only, ormigration_plus_fallback_months. Bridge-only GoldenGate is excluded from future steady-state BOMs.
Read Architecture
ADB-S and ADB-D can carry the same workload demand while using different read architectures. ADB-S may require refreshable/read clones when standby is not the application read path. ADB-D may use Local ADG read-only standby and retire steady-state clones. The deck should call this out in BOM notes, value drivers, and risk/value slides.
Storage Economics
Storage economics are shown separately from aggregate TCO:
break-even TB = fixed dedicated infra monthly cost / ADB-S storage USD per GB-month / 1024
Apply discounts uniformly when comparing scenarios. If customer material provides a baseline break-even, show it beside the recalculated break-even for the proposed footprint.
Business Value
Risk-reduction cases use a Business Value Model instead of generic ROI percentages. Do not invent revenue impact. Convert stability to USD only when the customer provides revenue-at-risk, transaction margin, fraud loss impact, or cost per degraded/outage hour.
Use:
avoided degraded/outage hours x business impact per hour
Track success metrics such as CPU utilization, read latency, clone lag retired, ADG read lag, GoldenGate/apply lag during migration, incidents avoided, and degraded hours avoided.
Validation
Business-case deck validation reads text boxes, table cells, and grouped shapes.
It checks expected titles, disclaimer-last, required assumptions, and forbidden
obsolete phrases such as OCI Annual, stale scenario risks, and unclear
language like FTE-year.